RM Analyzer Help

Schedules

Definition of the Activation, Schedule Actions, and Loads. Several consecutive construction stages are combined in one schedule group (i.e. erection sequence of one cantilever at one pier). Group names are defined in Group name and generated groups can be selected by clicking on the arrow. New groups can be added (before or after the selected one) or be deleted by clicking on the respective icons in the upper part of the window. The copy icon will copy the selected schedule group to an existing group that can be selected from a list (and will be replaced then) or to a new one that can be generated and will be inserted at the end. The maximum number of schedule groups is 32.

Note: For a reasonable and efficient use of schedule groups and the principle behind the schedule definitions in Cantilever itself refer to the Cantilever Manual.

With the tool button the width of the columns in the schedule can be adjusted. (When not needed, column widths can also be set to 0).

Undo and Redo will undo the last action (or undo the last undo respectively).